Scandic Sodra Kajen, Sweden

Custom Furniture and Interior Solutions for Hotel Public Areas

Custom furniture and interior solutions for hotel public areas require precise timing, advanced material coordination, and uncompromising quality standards. The Scandic Södra Kajen project is a strong example of how complex design concepts can be successfully delivered in a high-traffic hospitality environment where durability, safety, and aesthetics must work together seamlessly.

This project focused on furnishing and constructing public areas of the hotel, where every detail is exposed to intensive daily use. The main challenges were tight project timelines and the integration of a wide range of materials into one cohesive interior solution.
Scandic Södra Kajen is a contemporary hotel project with expressive interior concepts and multifunctional public spaces. These areas serve guests continuously, making material quality and construction reliability critical from day one.

Our task was to manufacture and install custom-built interior elements for hotel public areas, ensuring visual impact while meeting strict functional and durability requirements typical for large hospitality projects.

KEY Points

Coordinated production under strict deadlines

Hotel projects are highly schedule-driven, with multiple trades working in parallel and limited flexibility for delays. In the Scandic Södra Kajen project, timing was one of the most critical challenges.
Each element had to be manufactured, delivered, and installed according to a precisely coordinated schedule. This required detailed production planning, clear communication between teams, and accurate documentation to avoid on-site adjustments that could impact timelines.
Delivering on time was essential not only for construction progress, but also for the hotel’s planned opening and operational readiness.

HOW FIKA DELIVERED THIS PROJECT

tailor-made construction

Furniture developed specifically for the client’s space and operations.

Smart Material Selection

Materials chosen for durability, maintenance, and long-term use.

Equipment Integration

Client-owned equipment integrated directly into technical drawings.

Clear Coordination

Straightforward communication with contractors throughout the process.

Precision Production

Manufacturing focused on accuracy, consistency, and quality control.

tailor-made
construction

Furniture developed specifically for the client’s space and operations.

Smart Material
election

Materials chosen for durability, maintenance, and long-term use.

Equipment
Integration

Client-owned equipment integrated directly into technical drawings.

Clear
Coordination

Straightforward communication with contractors throughout the process.

Precision
Production

Manufacturing focused on accuracy, consistency, and quality control.

The outcome:

The final result is a set of visually strong, technically reliable public spaces that reflect the hotel’s identity while supporting everyday operations. The Scandic Södra Kajen project demonstrates how custom furniture and interior manufacturing for hotel public areas can successfully combine design ambition, material complexity, and precise execution within demanding timelines.

UAB FIKA LT
Rokakiemio g. 18,
Kaunas LT-46115, Lietuva

Sales
Tel. +370 608 48647
E-mail: sales@fika.lt
General questions, Logistics
Tel. +370 37 211979
E-mail: info@fika.lt

Get in Touch!

Contact Form